| |
Dilip Chhajed
Professor of Business Administration and Associate Head of Business Administration
Kim, K., Chhajed, D., Liu, Y. Forthcoming. Can Commonality Relieve Cannibalization in Product Line Design? Marketing Science
Anand, G. , Chhajed, D., Delfin, L. 2012. Job Autonomy, Trust in Leadership, and Continuous Improvement: An Empirical Study in Health Care. Operations Management Research, 5: 70-80
Li, K., Chhajed, D., Mallik, S. 2012. Design Of Extended Warranties in Supply Chains
Under Additive Demand
. Production and Operations Management
Chhajed, D., Blocher, J. 2008. Minimizing Customer Order Lead-Time in Two Stage Assembly Supply Chain. Annals of Operations Research, 25-52
Wu, C., Petruzzi, N. , Chhajed, D. 2007. Vertical Integration with Price-Setting Competitive Newsvendors. Decision Sciences, 38: 581-610
Mallik, S., Chhajed, D. 2006. Optimal Temporal Product Introduction Strategies under Valuation Changes and Learning. European Journal of Operational Research, 172: 430-452
Chhajed, D., Kim, K. 2005. Strict-Product-Ordering Approach in the Verticle Product Line Design Problem. IIE Transactions, 37: 319-332
Yalabik, B., Petruzzi, N. , Chhajed, D. 2005. An Integrated Product Returns Model With Logistics and Marketing Coordination. European Journal of Operational Research, 161: 162-182
Chhajed, D., Kim, K. 2004. The Role of Inclination and Part Worth Differences Across Segments in Designing a Price Discrimination Product Line. International Journal of Research Marketing, 21: 313-320
Lucas, M., Chhajed, D. 2004. Location Problems in Agribusiness. Journal of Operational Research Society, 55: 561-578
Chiang, W., Chhajed, D., Hess, J. 2003. Direct Marketing, Indirect Profits: A Strategic Analysis of Dual-Channel Supply Chain Design. Management Science, 49: 1-20
Kim, K., Chhajed, D. 2002. Product Design with Multiple Quality-Type Attributes. Management Science, 48: 1502-1511
Kim, K., Chhajed, D., Palekar, U. 2002. A Comparative Study of the Performance of Push and Pull Systems in the Presence of Emergency Orders. International Journal of Production Research, 40: 1627-1646
Kim, K., Chhajed, D. 2001. An Experimental Investigation of Valuation Change Due to Commonality in Vertical Product Line Extension. Journal of Product Innovation Management, 18: 219-230
Chhajed, D., Lowe, T. 2000. Tooling Choices and Product Performance. IIE Transactions, 32: 49-58
Kim, K., Chhajed, D. 2000. Commonality in Product Design: Cost Saving and Cannibalization. European Journal of Operational Research, 125: 605-621
Blocher, J., Chhajed, D., Leung, M. 1998. Customer Order Scheduling in a General Job-Shop Environment, 29: 951-981
Chhajed, D., Lowe, T. 1998. Solving a Selected Class of Location Problems by Exploiting Problem Structure: A Decomposition Approach. Naval Research Logistics, 45: 791-815
Hsu, N., Chhajed, D., Lowe, T. 1998. Tool Design Problems in a Punch Press Flexible Manufacturing Systems. IIE Transactions, 30: 331-340
Chhajed, D. 1997. Edge Coloring a K-Tree into Two Smaller Trees. Networks, 29: 191-194
Chhajed, D. 1997. Modern Supply Management Makes Market Entry Difficult? Purchasing Magazine, 121: 24-30
Chhajed, D., Viswanathan, M. 1997. The Importance of Leadtime: A Study of Steel Products. Purchasing Magazine
Chhajed, D., Palekar, U. 1997. Dominant Graphs for Rectilinear Network Design in the Presence of Barriers. IIE Transactions, 28: 255-263
Shaw, M. , Sikora, R., Chhajed, D. 1996. Integrating the Lot-Sizing and Sequencing Decisions for Lead-Time Reduction in a Printed Circuit Boards Manufacturing Environment. Computers & Industrial Engineering, 30: 659-671
Blocher, J., Chhajed, D. 1996. The Customer Order Lead Time Problem on Parallel Machines. Naval Research Logistics, 43: 629-654
Sikora, R., Chhajed, D., Shaw, M. 1996. Integrating a Lot-Sizing and Sequencing Decision for Lead-Time Reduction in Printed Circuit Boards Manufacturing Environment. Computers & Industrial Engineering, 30: 659-679
Chhajed, D. 1995. A Fixed Interval Due-Date Scheduling Problem with Earliness and Due-Date Costs. European Journal of Operational Research, 84: 533-549
Chhajed, D., Chandru, V. 1995. Rectilinear Hull-Efficient Sets- Convex Hull: Relationship and Algorithms. Orsa Journal on Computing, 7: 78-83
Chhajed, D., Kim, K. 1995. How Important are Leadtimes? Purchasing Magazine, 119: 5
Raman, N., Chhajed, D. 1995. Simultaneous Determination of Product Attributes and Prices, and Production Processes in Product-Line Design. Journal of Operations Management, 12: 187-204
Chand, S., Chhajed, D., Traub, R. 1994. Single Machine Scheduling with Fixed Delivery Dates. Production and Operations Management, 3: 296-307
Chhajed, D., Lowe, T. 1994. Solving Structured Multifacility Location Problems Efficiently. Transportation Science Journal, 28: 104-115
Chhajed, D., Francis, R., Lowe, T. 1993. Contributions of Operations Research to Location Theory. Location Science, 1: 263-287
Chand, S., Chhajed, D. 1992. A Single Machine Model for Determination of Optimal Due Dates and Sequence. Operations Research, 40: 596-602
Chhajed, D., Lowe, T. 1992. An O(np) Algorithm for a Special Case of the Multimedian Location Problem on a Tree. European Journal of Operational Research, 63: 222-230
Chhajed, D., Lowe, T. 1992. Locating Facilities which Interact: Some Solvable Cases. Annals of Operations Research, 40: 101-124
Chhajed, D., Lowe, T. 1992. M-Median and M-Center Problems with Mutual Communication: Solvable Special Cases. Operations Research, 40: S56-S66
Chhajed, D., Montreuil, B., Lowe, T. 1992. Flow Network Design for Manufacturing Systems Layout. European Journal of Operational Research, 57: 145-161
Chhajed, D. 1988. A Note on Minimizing the Maximum Deviation of Job Competion Time About a Common Due Date. Applied Mathematics Letters, 1: 161-163
Chhajed, D., Lowe, T. 2008. Building Intuition: Insights from Basic Operations Management Models and Principles. Berlin-Heidelberg: Springer-Verlag.
Chhajed, D., Lowe, T. 2008. The Median Problem. In Chhajed and Lowe (Ed.), Building Intuition: Insights from Basic Operations Management Models and Principles, 101-114. Berlin-Heidelberg: Springer-Verlag.
Chhajed, D., Chiang, W. 2005. Optimal Supply-Chain Channel Design in B2B Electronic Commerce. In Geunes, J. and P. Pardolas (Ed.), Supply Chain Optimization, 145-168. Berlin-Heidelberg: Springer-Verlag.
Shaw, M. , Chhajed, D., Lee, I. 2002. A Strategic Evaluation Methodology for Advanced Manufacturing Technologies: Integration of Product, Process, and Financial Evaluation. In J. Lavelle, H. Liggett, & H. Paresi (Ed.), Economic Evaluation of Advanced Technologies: Techniques and Case Studies, 119-146. New York: Taylor and Francis.
Chhajed, D., Francis, R., Lowe, T. 2001. Facility Location. In Encyclopedia of Operations Research and Management Science. Kluwer Academic Press.
Lee, I., Chhajed, D. 2001. A Strategic Evaluation Model for Flexible Manufacturing Systems: Integration of Product, Process and Financial Features. In Economic Evaluation of Advanced Technologies: Techniques and Case Studies, 119-146. New York: Taylor and Francis.
Chhajed, D., Lowe, T., Montreuil, B. 1993. Integrated Station Location and Flow Network Design for Manufacturing Systems Layout. In Operations Research in Production Planning and Control, 120-137. Berlin-Heidelberg: Springer-Verlag.
Li, K., Chhajed, D., Mallik, S. 2010. Quality Signaling through Warranty & Brand ReputationIEEE International Conference on Service Operations and Logistics and Informatics, 7-11
Kim, K., Chhajed, D. 2000. Experimental Investigatin of Valuation Change Due to Commonality in Product DesignDSI Conference, 1180-1181
Chhajed, D., Xu, N., Lowe, T. 1994. Tool Design Problems in a Punch Press Flexible Manufacturing SystemsORSA Technical Section on Manufacturing Management, 25-30
Chhajed, D., Lowe, T. 1993. A Generic Multifacility Location Problem: Examples and Solution ProcedureInternational Symposium on Location Decision, 55-60
Chhajed, D., Raman, N. 1992. Integrated Product and Process DesignInternational Conference on Optimization Techniques and Applications, 1172-1180. World Scientific Publishing Co..
Anand, G. , Chhajed, D., Scagnoli, N. , Hong, S. 2013. Introducing Mobile Technology in Graduate Professional Education
Gu, W., Chhajed, D., Yalabik, B., Petruzzi, N. 2012. Optimal Quality Design for Remanufacturing with Environmental Implications
Yalabik, B., Chhajed, D., Petruzzi, N. 2012. Product and Sales Contract Design in Remanufacturing
Gu, W., Chhajed, D. 2011. Product Line Design with Capacity Constraint. Production and Operations Management
Li, K., Chhajed, D., Mallik, S. 2009. The Interaction of Quality, Warranty, and Price
Shao, B., Chhajed, D. 2009. Product Design for the Bottom of the Market
Shao, B., Chhajed, D. 2009. The Impact of Context Effect on Product Design
Wu, C., Chhajed, D. 2009. Optimal Channel Design and Pricing in a Centralized Distribution System
Chhajed, D. 2012. Remanufacturing, Production, and ConsumptionInternational Conference
on
Creating A Sustainable Business: Managerial Implications and Challenges, Jaipur.
Gu, W., Chhajed, D., Petruzzi, N. 2012. Product Quality Design in Reverse Supply ChainINFORMS Annual Meeting, Phoenix.
Li, K., Chhajed, D., Mallik, S. 2012. The Interaction of Quality, Warranty, and Brand ReputationProduction and Operations Management Meeting, Chicago.
Chhajed, D. 2011. Technology Management at IllinoisManagement of Technology Education: Building an Architecture, Seoul.
Gu, W., Chhajed, D., Petruzzi, N. 2011. Environmental Effect of RemanufacturingDecision Science Institute Annual Meeting, Boston.
Chhajed, D. 2010. Active LearningDSI Doctoral Student Consortium, San Diego.
Chhajed, D., Kim, K. 2009. Commonality in Product Line Design under Negatively Correlated Preference StructureINFORMS Annual Meeting, San Diego.
Chhajed, D. 2008. System Components BundlingINFORMS Annual Meeting, Washington, D.C..
Chhajed, D. 2008. Better Process ManagementJaipuria Institute of Management, Jaipur.
Chhajed, D. 2008. Commonality in Product Line Design under Horizontal Preference StructureUniversity of Iowa, Iowa City.
Chhajed, D. 2002. On the Appropriateness of Attribute-Level Ordering Approach in Vertical Product Line DesignDecision Science Institute Annual Meeting, San Diego.
Chhajed, D. 2002. Optimal Temporal Product Introduction Strategies Under Valuatino Changes and LearningINFORMS Conference, San Jose.
Chhajed, D. 2002. Remanufacturing Economics: Product, Process, and Contract DesignINFORMS Conference, San Jose.
Chhajed, D. 2001. An Integrated Product Return ModelINFORMS National Meetings, Miami.
Chhajed, D. 2000. Experimental Investigation of Valuation Change Due to Commonality in Product DesignDSI Conference, Orlando.
Chhajed, D. 2000. Price Setting in Direct and Retail to Customer Supply ChannelsINFORMS Conference, Salt Lake City.
Chhajed, D. 1999. Minimizing Customer Order Leadtime in a 2-Stage Assembly FlowshopINFORMS Conference, Cincinnati.
Chhajed, D. 1998. Product Design with Multiple AttributesINFORMS Conference, Montreal.
Chhajed, D. 1998. Transportation LogisticsUniversity of Iowa, Iowa City.
Chhajed, D. 1998. Product Design with CommonalityMid-West Roundtable on Manufacturing and Logistics, West Lafayette.
Chhajed, D. 1997. Edge Partitioning a K-Tree into Two Smaller TreesINFORMS Conference, San Diego.
Chhajed, D. 1997. Operations Management and CaterpillarUniversity of Illinois, Urbana-Champaign.
Chhajed, D. 1997. Research in Operations ManagementIllinois Manufacuring Extension Center, Urbana-Champaign.
Chhajed, D. 1996. Modular Product DesignConvention of the Operations Research Society of India, Mumbai.
Chhajed, D. 1996. Customer Order Scheduling Problem on Dedicated MachinesProduction and Operations Management Meeting, Indianapolis.
Chhajed, D. 1996. Six Blind People and the Elephant: After the SurgeryProduction and Operations Management Meeting, Indianapolis.
Chhajed, D. 1996. Tool Choices and Product Design: Specially Structured Integer Programming ProblemsINFORMS National Meetings, Washington.
Chhajed, D. 1996. Why Should You Reduce Your LeadtimeINFORMS National Meetings, Washington.
Chhajed, D. 1996. Problems in Product DesignUniversity of Illinois, Urbana-Champaign.
Chhajed, D. 1995. A Decomposition Approach to Solve Location ProblemsINFORMS National Meetings, Los Angeles.
Chhajed, D. 1995. Justifying Investment in Manufacturing TechnologiesMid-West Roundtable on Manufacturing and Logistics, Iowa City.
Chhajed, D. 1994. Scheduling Jobs with Multiple Jobs Customer OrdersConvention of the Operations Research Society of India, Calcutta.
Chhajed, D. 1994. Scheduling and Other Research: Past and FutureNorthwestern University, Evanston.
Chhajed, D. 1994. Scheduling Customer Orders on Parallel MachinesPurdue University, West Lafayette.
Chhajed, D. 1994. Minimizing Leadtime with Multiple-Job Customer OrdersUniversity of Illinois, Urbana-Champaign.
Chhajed, D., Chand, S., Traub, R. 1994. A Single-Machine Scheduling Model with Fixed Interval DeliveriesORSA/TIMS, Detroit.
Chhajed, D., Xu, N., Lowe, T. 1994. Tool Design Problems in a Punch Press Flexible Manufacturing SystemsORSA/TIMS, Boston.
Chhajed, D. 1993. Multifacility Location ProblemNorthwestern University, Evanston.
Chhajed, D. 1993. Solving Structured Multifacility Location Problems EfficientlyRegional Science Program Seminar, Urbana-Champaign.
Chhajed, D., Blocher, D. 1993. Customer Order Lead Time ProblemProduction and Operations Management Meeting, Washington.
Chhajed, D., Blocher, D. 1993. Scheduling Customer Orders ProblemORSA/TIMS, Chicago.
Chhajed, D., Raman, N. 1993. Integrated Product Line Design and Process SelectionORSA/TIMS, Phoenix.
Chhajed, D. 1992. Solving the Multifacility Location Problem by a Decomposition ApproachORSA/TIMS, San Francisco.
Chhajed, D. 1992. Location Problems in AgribusinessRegional Science Association Meeting, Chicago.
Chhajed, D. 1991. Node Selection Problem: Applications and Solution ProcedureIndiana University, Bloomington.
Chhajed, D. 1991. Node Selection Problem: Applications and Solution ProcedureUniversity of Illinois, Urbana-Champaign.
Chhajed, D. 1990. M-median and M-center Problems with Mutual Communication: Solvable CasesInternational Symposium on Location Decisions, Fullerton.
Chhajed, D., Lowe, T. 1990. Node Selection Problem: Application And Solvable CasesORSA/TIMS, Philadelphia.
Chhajed, D., Lowe, T. 1990. Relaxed Quadratic Assignment Problem on a Series-Parallel GraphORSA/TIMS, Las Vegas.
Chhajed, D. 1989. A Single Mahcine Model for Determination of Optimal Due Dates and SequenceORSA/TIMS, New York.
Chhajed, D., Lowe, T., Montreuil, B. 1989. Integrated Optimization Models for Layout and Flow Network DesignCORS/TIMS/ORSA, Vancouver.
Chhajed, D., Lowe, T., Montreuil, B. 1988. Material Flow Network DesignORSA/TIMS, Denver.
|
4022 BIF 515 East Gregory Drive Champaign, IL, 61820 (217) 333-3778 chhajed@illinois.edu
Faculty Profile
|
|